Projects

– NEXA RESOURCES PERÚ S.A.A. –

Numerical hydrogeological model at the tailings beach zone for the Cerro Lindo Mining Unit

Chincha/Ica/Perú

November 2021 – December 2022


Geophysical Study for the Santa Rosa Mining Unit

Concepción/Junín/Perú

August – September 2021


Hydrogeological study for closure of the Santa rosa Mining Unit

Concepción/Junín/Perú

June 2021 – December 2022


Hydrogeological Study Tailings Beach Station Wells Zone -Jahuay – Cerro Lindo Mining Unit

Chincha/Ica/Perú

March – November 2021


Development of the ANA Dossier (Attachment 5) for the Cerro Lindo Mining Unit

Chincha/Ica/Perú

March - April 2021


Hydrogeologicalstudy for closure of the Sinaycocha Mining Unit

Junín/Perú

August 2020 – December 2022


Development of the ITS for the Sinaycocha Project – Hydrogeological Drillings

Junín/Perú

March 2020 – June 2021


Accompaniment during groundwater sampling in piezometers and geophysical study during OEFA supervision – Cerro Lindo Mining Unit

Chincha/Ica/Perú

August – September 2019


Geophysical Electrical Survey Tomography at the Cerro Lindo Mining Unit

Chincha/Ica/Perú

July – October 2019


Conceptual definition of Hydrochemical drillings depths – Cerro Lindo Mining Unit

Chincha/Ica/Perú

July – October 2019


Piezometer design and supervision of insulation Cerro Lindo Mining Unit

Chincha/Ica/Perú

February – March 2019