Projects

– LIMA AIRPORT PARTNERS S.R.L. –

Under contract of:

Jorge Chavez Airport - Well Inspection and Recovery

Ubicación: Callao/Lima/Perú

Año: Agosto – Noviembre 2024

Under contract of:

PCA Ventanilla Water Balance

Ubicación: Callao/Lima/Perú

Año: February - April 2024

Under contract of:

Review of the hydrogeological components of the Subdrainage System required as part of the ITS management. Update of the Numeric Hydrogeological Model for the Design of the Zone 10 Subdrainage System of the Jorge Chavez Airport

Ubicación: Lima/Perú

Año: Octubre 2021 – Abril 2022

Under contract of:

Inventory of groundwater, surface water and hydraulic infrastructure in the AID of the AUC, and development of the hydrogeological baseline for the Second Modification to the Environmental Impact Study

Ubicación: Lima/Perú

Año: Julio 2021 – Junio 2022

Under contract of:

Hydrogeological study for the design of the zone 10 subdrainage system of the Jorge Chavez International Airport

Ubicación: Lima/Perú

Año: Enero – Mayo 2021

Under contract of:

Development of Dossiers 5, 8, 16 and 21 for ANA and Development of the hydrogeological Component for the ITS of the Jorge Chavez International Airport Expansion

Ubicación: Lima/Perú

Año: Febrero 2020 – Diciembre 2021

Under contract of:

Update of the numeric hydrogeological model for the expansion of the Jorge Chavez International Airport

Ubicación: Lima/Perú

Año: Julio 2020 – Febrero 2021