Projects

– NEXA RESOURCES PERÚ S.A.A. –

Numerical hydrogeological model at the tailings beach zone for the Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: November 2021 – December 2022

Hydrogeological Study Tailings Beach Station Wells Zone -Jahuay – Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: Agosto – Noviembre 2021

Development of the ANA Dossier (Attachment 5) for the Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: Enero – Julio 2021

Geophysical Electrical Survey Tomography at the Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: July – October 2019

Conceptual definition of Hydrochemical drillings depths – Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: July – October 2019

Piezometer design and supervision of insulation Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: February – March 2019

Support in Groundwater Sampling in Piezometers and Geophysical Study during Supervision of OEFA – Cerro Lindo Mining Unit

Lugar: Chincha/Ica/Perú

Año: August – September 2019

– NEXA RESOURCES ATACOCHA S.A.A. –

Hydrogeological study for closure of the Santa rosa Mining Unit

Lugar: Concepción/Junín/Perú

Año: Junio 2021 – Febrero 2023

Geophysical Study for the Santa Rosa Mining Unit

Lugar: Concepción/Junín/Perú

Año: Junio 2021 – Noviembre 2021

Hydrogeologicalstudy for closure of the Sinaycocha Mining Unit

Lugar: Junín/Perú

Año: Julio 2020 – Abril 2023

Development of the ITS for the Sinaycocha Project – Hydrogeological Drillings

Lugar: Junín/Perú

Año: Marzo 2020 – Agosto 2021